Libros importados hasta 50% OFF + Envío Gratis a todo USA  Ver más

menú

0
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional
portada Strategic Forces: Testing of Air Launched Cruise Missile Components Questioned: Nsiad-88-65br (en Inglés)
Formato
Libro Físico
Editorial
Idioma
Inglés
N° páginas
32
Encuadernación
Tapa Blanda
Dimensiones
24.6 x 18.9 x 0.2 cm
Peso
0.08 kg.
ISBN13
9781289222970

Strategic Forces: Testing of Air Launched Cruise Missile Components Questioned: Nsiad-88-65br (en Inglés)

U. S. Government Accountability Office ( ; U. S. Government Accountability Office ( (Autor) · Bibliogov · Tapa Blanda

Strategic Forces: Testing of Air Launched Cruise Missile Components Questioned: Nsiad-88-65br (en Inglés) - U. S. Government Accountability Office ( ; U. S. Government Accountability Office (

Libro Físico

$ 13.26

$ 15.75

Ahorras: $ 2.49

16% descuento
  • Estado: Nuevo
Se enviará desde nuestra bodega entre el Miércoles 31 de Julio y el Jueves 01 de Agosto.
Lo recibirás en cualquier lugar de Estados Unidos entre 1 y 3 días hábiles luego del envío.

Reseña del libro "Strategic Forces: Testing of Air Launched Cruise Missile Components Questioned: Nsiad-88-65br (en Inglés)"

In response to a congressional request, GAO provided information on the Air Force's investigation of alleged improper testing of flight data transmitters installed in Air-Launched Cruise Missiles (ALCM). GAO found that: (1) the Air Force's Office of Special Investigation turned over its findings to the Department of Justice; (2) the subcontractor's investigations turned up some testing irregularities in 29 flight data transmitters; (3) the subcontractor took disciplinary actions against the employees responsible for the improper testing; (4) the subcontractor volunteered to retest the transmitters at no additional cost to the government and cooperated with Justice in its investigation; and (5) the prime contractor and the subcontractor have taken measures to ensure proper quality controls in all program divisions. GAO also found that: (1) although the ALCM system manager reported that the missiles were reliable, other tests revealed that 10 of 11 transmitters did not meet specifications; (2) because the Air Force questioned the test results' validity and methodology, it planned to conduct additional tests; and (3) the Air Force did not investigate the effectiveness of the subcontractor's quality assurance system prior to the disclosure of the irregularities.

Opiniones del libro

Ver más opiniones de clientes
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)

Preguntas frecuentes sobre el libro

Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.

Preguntas y respuestas sobre el libro

¿Tienes una pregunta sobre el libro? Inicia sesión para poder agregar tu propia pregunta.

Opiniones sobre Buscalibre

Ver más opiniones de clientes