portada gert networks and the time-oriented evaluation of projects (en Inglés)
Formato
Libro Físico
Editorial
Año
1979
Idioma
Inglés
N° páginas
272
Encuadernación
Tapa Blanda
Dimensiones
24.4 x 17.0 x 1.5 cm
Peso
0.44 kg.
ISBN
3540097058
ISBN13
9783540097051

gert networks and the time-oriented evaluation of projects (en Inglés)

K. Neumann (Autor) · U. Steinhardt (Autor) · Springer · Tapa Blanda

gert networks and the time-oriented evaluation of projects (en Inglés) - Neumann, K. ; Steinhardt, U.

Libro Físico

$ 52.09

$ 54.99

Ahorras: $ 2.90

5% descuento
  • Estado: Nuevo
Se enviará desde nuestra bodega entre el Viernes 28 de Junio y el Lunes 01 de Julio.
Lo recibirás en cualquier lugar de Estados Unidos entre 1 y 3 días hábiles luego del envío.

Reseña del libro "gert networks and the time-oriented evaluation of projects (en Inglés)"

Towards the end of the fifties methods for planning, scheduling, and control of proj- ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In this association, the individual activities of the project correspond to the arcs, the so-called proj- ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be- gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before- hand, that every activity and every event are realized exactly once during the exe- cution of the project, and that "feedback" (corresponding to cycles in the asso- ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production p 1 anni ng, do not sa ti sfy the foregoi ng res tri cti ons.

Opiniones del libro

Ver más opiniones de clientes
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)

Preguntas frecuentes sobre el libro

Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.

Preguntas y respuestas sobre el libro

¿Tienes una pregunta sobre el libro? Inicia sesión para poder agregar tu propia pregunta.

Opiniones sobre Buscalibre

Ver más opiniones de clientes